Project Management Terminology Starting with “T” – Easy Guide - Part 1
Understand project management terminology starting with “T” including task, teamwork, top-down estimating and total float.
Project Management Terminology (Starting with “T”)
1. Task
Definition:
A specific unit of work within a project.
Simple Meaning:
Project ka chhota kaam.
Example:
Pump alignment is a task within installation project.
2. Timeline
Definition:
A visual representation of project schedule.
Simple Meaning:
Project ka time chart.
Example:
Foundation → erection → testing timeline chart.
3. Target
Definition:
A specific goal to be achieved within a time frame.
Simple Meaning:
Kaam complete karne ka goal.
Example:
Pump installation complete within 15 days.
4. Tender
Definition:
A formal invitation to suppliers to bid for a project.
Simple Meaning:
Vendor ko kaam ke liye invite karna.
Example:
Laser cutting machine procurement tender.
5. Technical Specification
Definition:
Detailed technical requirements of a product or system.
Simple Meaning:
Machine ya system ke technical details.
Example:
Pump pressure 250 bar, flow 300 m³/hr.
6. Time Management
Definition:
Planning and controlling project schedule.
Simple Meaning:
Time ko control karna.
Example:
Daily progress monitoring at site.
7. Task Duration
Definition:
Time required to complete a task.
Simple Meaning:
Ek kaam me kitna time lagega.
Example:
Pump erection duration = 5 days.
8. Task Dependency
Definition:
Relationship between tasks where one depends on another.
Simple Meaning:
Ek kaam dusre par depend karta hai.
Example:
Foundation complete hone ke baad hi erection start hoga.
9. Task Tracking
Definition:
Monitoring progress of tasks.
Simple Meaning:
Kaam ka status check karna.
Example:
Daily erection progress tracking.
10. Task Priority
Definition:
Level of importance assigned to a task.
Simple Meaning:
Kaunsa kaam pehle karna hai.
Example:
Shutdown work high priority.
11. Total Float
Definition:
Time a task can be delayed without delaying project completion.
Simple Meaning:
Allowed delay time.
Example:
Cable laying me 3 days float available.
12. Time Baseline
Definition:
Approved schedule used for comparison.
Simple Meaning:
Original time plan.
Example:
120-day baseline schedule.
13. Time Overrun
Definition:
Delay beyond planned schedule.
Simple Meaning:
Project late ho gaya.
Example:
Material delay ke kaaran erection late hua.
14. Time Tracking
Definition:
Recording time spent on project tasks.
Simple Meaning:
Kitna time kaam me laga record karna.
Example:
Daily timesheet entry.
15. Throughput
Definition:
Amount of work completed in a given time.
Simple Meaning:
Ek time me kitna kaam hua.
Example:
10 pipelines installed in 2 days.
16. Tolerance
Definition:
Acceptable deviation from planned values.
Simple Meaning:
Allowed variation limit.
Example:
Pump alignment tolerance ±0.05 mm.
17. Test Plan
Definition:
Document defining testing procedures and criteria.
Simple Meaning:
Testing ka plan.
Example:
Pressure testing plan for piping system.
18. Testing & Commissioning
Definition:
Final phase to verify system performance before handover.
Simple Meaning:
System check karke start karna.
Example:
Descaling pump trial run and commissioning.
19. Turnkey Project
Definition:
A project delivered fully completed and ready to operate.
Simple Meaning:
Ready-to-use project.
Example:
Complete descaling system installed & handed over.
20. Task List
Definition:
List of all activities required in project.
Simple Meaning:
Project ke sab kaam ki list.
Example:
Foundation, erection, piping, testing.